Completed
Rapti Khola Bridge
Name of Project:Rapti Khola Bridge
DESIGN AND BUILD OF RAPTI BRIDGE CONNECTING HASNAPUR CHOWK, SATBARIYA-1 AND CHAPPA, BELA-5, DANG
Joint Venture: Tundi: 37.5% Sharma: 37.5% Hirachan: 25%
Project Planning
Total length of Bridge: 550.42 M, Type of Bridge: Prestressed Concrete, Carriage Width 7.5m, total width 10.5m, Type of Foundation: Pile Foundation, Type of Superstructure: Pre-Stressed Box-Girder, Max Pier Height: 7.741m
Initiated on
10 July, 2016
Client
Government of Nepal, Ministry of Physical Infrastructure and Transport Department of Roads Bridge Branch
Location
Rapti