Completed
Three Bridges: Package II 1. Marin Khola Bridge, 2. Kmala Khoj, 3. Ratu River
Name of Project:Three Bridges: Package II 1. Marin Khola Bridge, 2. Kmala Khoj, 3. Ratu River
DESIGN AND BUILD OF THREE BRIDGES: PACKAGE II 1. MARIN KHOLA BRIDGE, KAPILAKOT (NAYABASTI)-KALPABRIKHSA (SAHAN, SINDHILI 2. KMALA KHOJ, HARSHAHI (JAGADI)-SIRTHAULI (KHANIYA), SINDHULI, 3. RATU RIVER, MRM, BARDIBAS, MAHOTTARI
Joint Venture Kalika: 34% Tundi: 33% Rasuwa: 33%
Project Planning
Total length of Bridge: 1125.00 M, Type of Superstructure: Marin & Kamala Bridge Prestree Box- Stress Box girder & Ratu Bridge Pre-Stress. Contcrete Works, Asphalt Pavement Approach Road, and River Training Works.
Client
GoN, MPIT, DOR, Bridge Project Eastern Region Sector No1, Dharan, Sunsari
Location
Sunsari